Pr 53 Westbound over Hucar Creek
FairSalinas Municipio, Puerto Rico · 7 KM Northwest of Salinas · Structure no. 019552
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 100 ft
- 1 main span
- Daily traffic
- 9,050
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 53 Westbound over Hucar Creek is a prestressed concrete stringer/multi-beam or girder carrying Pr 53 Westbound over Hucar Creek in Salinas Municipio, Puerto Rico. It was built in 1992, so it is 33 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,050 vehicles a day, roughly 4% of them trucks, projected to reach 13,100 by 2025. The structure is 100 ft (30.6 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 53 Westbound over Hucar Creek built?
It was built in 1992, making it 33 years old in 2025.
What condition is Pr 53 Westbound over Hucar Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Pr 53 Westbound over Hucar Creek carry?
About 9,050 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 53 Westbound over Hucar Creek?
The structure is 100 ft (30.6 m) long with a longest span of 96 ft (29.2 m) and a deck 44 ft wide.
Who owns Pr 53 Westbound over Hucar Creek?
It is owned by the State Highway Agency.