Pr 2 183.5 KM over Pr 328 0.03 KM
FairSabana Grande Municipio, Puerto Rico · 1.2 KM S of Sabana Grande · Structure no. 014761
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 580 ft
- 8 main spans
- Daily traffic
- 27,500
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 2 183.5 KM over Pr 328 0.03 KM is a prestressed concrete stringer/multi-beam or girder carrying Pr 2 183.5 KM over Pr 328 0.03 KM in Sabana Grande Municipio, Puerto Rico. It was built in 1974, so it is 51 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 27,500 vehicles a day, roughly 5% of them trucks, projected to reach 37,400 by 2025. The structure is 580 ft (176.7 m) long and 95 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 2 183.5 KM over Pr 328 0.03 KM built?
It was built in 1974, making it 51 years old in 2025.
What condition is Pr 2 183.5 KM over Pr 328 0.03 KM in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Pr 2 183.5 KM over Pr 328 0.03 KM carry?
About 27,500 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 2 183.5 KM over Pr 328 0.03 KM?
The structure is 580 ft (176.7 m) long with a longest span of 68 ft (20.7 m) and a deck 95 ft wide.
Who owns Pr 2 183.5 KM over Pr 328 0.03 KM?
It is owned by the State Highway Agency.