US Bridges

Pr 2 over Pr 102

Fair

Sabana Grande Municipio, Puerto Rico · 3 KM West Sabana Grande · Structure no. 009661

Built
1972
53 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
151 ft
2 main spans
Daily traffic
42,800
2005 count
Owner
State
State Highway Agency

About this bridge

Pr 2 over Pr 102 is a prestressed concrete stringer/multi-beam or girder carrying Pr 2 over Pr 102 in Sabana Grande Municipio, Puerto Rico. It was built in 1972, so it is 53 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 42,800 vehicles a day, roughly 5% of them trucks, projected to reach 45,724 by 2025. The structure is 151 ft (46 m) long and 98 ft wide.

CarriesPr 2
CrossesPr 102
Location3 KM West Sabana Grande
RouteState Highway 2
Coordinates18.08012, -66.98188
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.8 US tons
Inventory rating40.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length151 ft (46 m)
Longest span75 ft (23 m)
Deck width98 ft (29.8 m)
Roadway width91 ft (27.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42,800 (2005)
Projected traffic45,724 by 2025
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2.6 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 2 over Pr 102 built?

It was built in 1972, making it 53 years old in 2025.

What condition is Pr 2 over Pr 102 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Pr 2 over Pr 102 carry?

About 42,800 vehicles per day (2005 count), of which roughly 5% are trucks.

How long is Pr 2 over Pr 102?

The structure is 151 ft (46 m) long with a longest span of 75 ft (23 m) and a deck 98 ft wide.

Who owns Pr 2 over Pr 102?

It is owned by the State Highway Agency.