Pr 3 25.5 KM over Grande River
FairRio Grande Municipio, Puerto Rico · 1 KM East of Rio Grande · Structure no. 011641
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 166 ft
- 2 main spans
- Daily traffic
- 47,900
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 3 25.5 KM over Grande River is a prestressed concrete stringer/multi-beam or girder carrying Pr 3 25.5 KM over Grande River in Rio Grande Municipio, Puerto Rico. It was built in 1976, so it is 49 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 47,900 vehicles a day, roughly 4% of them trucks, projected to reach 65,600 by 2025. The structure is 166 ft (50.7 m) long and 94 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 3 25.5 KM over Grande River built?
It was built in 1976, making it 49 years old in 2025.
What condition is Pr 3 25.5 KM over Grande River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Pr 3 25.5 KM over Grande River carry?
About 47,900 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 3 25.5 KM over Grande River?
The structure is 166 ft (50.7 m) long with a longest span of 80 ft (24.5 m) and a deck 94 ft wide.
Who owns Pr 3 25.5 KM over Grande River?
It is owned by the State Highway Agency.