Pr 186 over Grande River
FairPosted for loadRio Grande Municipio, Puerto Rico · 10 KM South of Int Pr 3 · Structure no. 004461
- Built
- 1941
- 84 years old, rebuilt 1960
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete
- Length
- 73 ft
- 3 main spans
- Daily traffic
- 200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 186 over Grande River is a concrete slab carrying Pr 186 over Grande River in Rio Grande Municipio, Puerto Rico. It was built in 1941 and reconstructed in 1960, so it is 84 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 200 vehicles a day, roughly 2% of them trucks, projected to reach 300 by 2025. The structure is 73 ft (22.1 m) long and 31 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 186 over Grande River built?
It was built in 1941, making it 84 years old in 2025. It was reconstructed in 1960.
What condition is Pr 186 over Grande River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Pr 186 over Grande River carry?
About 200 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Pr 186 over Grande River?
The structure is 73 ft (22.1 m) long with a longest span of 26 ft (7.9 m) and a deck 31 ft wide.
Who owns Pr 186 over Grande River?
It is owned by the State Highway Agency.