US Bridges

Pr 2 222.0 KM over Runoff Drainage of Pr 2

Fair

Ponce Municipio, Puerto Rico · 6.28 Kms Noreast Ponce · Structure no. 028571

Built
2010
15 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
165 ft
4 main spans
Daily traffic
27,200
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 2 222.0 KM over Runoff Drainage of Pr 2 is a concrete culvert carrying Pr 2 222.0 KM over Runoff Drainage of Pr 2 in Ponce Municipio, Puerto Rico. It was built in 2010, so it is 15 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 27,200 vehicles a day, roughly 4% of them trucks, projected to reach 38,100 by 2025. The structure is 165 ft (50.4 m) long and 156 ft wide. If it were closed, the detour would be 18 mi (29 km).

CarriesPr 2 222.0 KM
CrossesRunoff Drainage of Pr 2
Location6.28 Kms Noreast Ponce
RouteState Highway 2
Coordinates17.97975, -66.66366
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating105.9 US tons
Inventory rating63.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length165 ft (50.4 m)
Longest span9 ft (2.7 m)
Deck width156 ft (47.7 m)
Roadway width112 ft (34 m)
Vertical clearance over deck9 ft (2.7 m)

Traffic and service

Average daily traffic27,200 (2017)
Projected traffic38,100 by 2025
Trucks4%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed18 mi (29 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 2 222.0 KM over Runoff Drainage of Pr 2 built?

It was built in 2010, making it 15 years old in 2025.

What condition is Pr 2 222.0 KM over Runoff Drainage of Pr 2 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Pr 2 222.0 KM over Runoff Drainage of Pr 2 carry?

About 27,200 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Pr 2 222.0 KM over Runoff Drainage of Pr 2?

The structure is 165 ft (50.4 m) long with a longest span of 9 ft (2.7 m) and a deck 156 ft wide.

Who owns Pr 2 222.0 KM over Runoff Drainage of Pr 2?

It is owned by the State Highway Agency.