Pr 52 Eastbound over Baramaya St.& Matild
FairPonce Municipio, Puerto Rico · 1 KM S.W of Ponce · Structure no. 024162
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,782 ft
- 17 main spans
- Daily traffic
- 9,400
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 52 Eastbound over Baramaya St.& Matild is a prestressed concrete stringer/multi-beam or girder carrying Pr 52 Eastbound over Baramaya St.& Matild in Ponce Municipio, Puerto Rico. It was built in 1996, so it is 29 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,400 vehicles a day, roughly 5% of them trucks, projected to reach 13,150 by 2025. The structure is 1,782 ft (543.2 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 52 Eastbound over Baramaya St.& Matild built?
It was built in 1996, making it 29 years old in 2025.
What condition is Pr 52 Eastbound over Baramaya St.& Matild in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pr 52 Eastbound over Baramaya St.& Matild carry?
About 9,400 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 52 Eastbound over Baramaya St.& Matild?
The structure is 1,782 ft (543.2 m) long with a longest span of 111 ft (33.9 m) and a deck 44 ft wide.
Who owns Pr 52 Eastbound over Baramaya St.& Matild?
It is owned by the State Highway Agency.