Pr 52 over Dirt Road
PoorPonce Municipio, Puerto Rico · 2 KM S E of Ponce · Structure no. 023681
- Built
- 1995
- 30 years old
- Condition
- Poor
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 164 ft
- 2 main spans
- Daily traffic
- 50,800
- 2017 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pr 52 over Dirt Road is a prestressed concrete stringer/multi-beam or girder carrying Pr 52 over Dirt Road in Ponce Municipio, Puerto Rico. It was built in 1995, so it is 30 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 50,800 vehicles a day, roughly 4% of them trucks, projected to reach 71,100 by 2025. The structure is 164 ft (49.9 m) long and 112 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 52 over Dirt Road built?
It was built in 1995, making it 30 years old in 2025.
What condition is Pr 52 over Dirt Road in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.
How much traffic does Pr 52 over Dirt Road carry?
About 50,800 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 52 over Dirt Road?
The structure is 164 ft (49.9 m) long with a longest span of 78 ft (23.8 m) and a deck 112 ft wide.
Who owns Pr 52 over Dirt Road?
It is owned by the State Toll Authority.