Pr 14 5.4 KM over Bucana River
FairPonce Municipio, Puerto Rico · At Ponce Entrance in PR14 · Structure no. 014331
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 292 ft
- 3 main spans
- Daily traffic
- 36,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 14 5.4 KM over Bucana River is a prestressed concrete stringer/multi-beam or girder carrying Pr 14 5.4 KM over Bucana River in Ponce Municipio, Puerto Rico. It was built in 1976, so it is 49 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 36,700 vehicles a day, roughly 4% of them trucks, projected to reach 45,500 by 2025. The structure is 292 ft (89.1 m) long and 60 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 14 5.4 KM over Bucana River built?
It was built in 1976, making it 49 years old in 2025.
What condition is Pr 14 5.4 KM over Bucana River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Pr 14 5.4 KM over Bucana River carry?
About 36,700 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 14 5.4 KM over Bucana River?
The structure is 292 ft (89.1 m) long with a longest span of 81 ft (24.6 m) and a deck 60 ft wide.
Who owns Pr 14 5.4 KM over Bucana River?
It is owned by the State Highway Agency.