Pr 132 over CA¥AS River
FairPonce Municipio, Puerto Rico · 2 KM West of Ponce · Structure no. 013731
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 126 ft
- 2 main spans
- Daily traffic
- 20,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 132 over CA¥AS River is a prestressed concrete stringer/multi-beam or girder carrying Pr 132 over CA¥AS River in Ponce Municipio, Puerto Rico. It was built in 1974, so it is 51 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20,700 vehicles a day, roughly 6% of them trucks, projected to reach 25,700 by 2025. The structure is 126 ft (38.4 m) long and 72 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 132 over CA¥AS River built?
It was built in 1974, making it 51 years old in 2025.
What condition is Pr 132 over CA¥AS River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Pr 132 over CA¥AS River carry?
About 20,700 vehicles per day (2017 count), of which roughly 6% are trucks.
How long is Pr 132 over CA¥AS River?
The structure is 126 ft (38.4 m) long with a longest span of 60 ft (18.4 m) and a deck 72 ft wide.
Who owns Pr 132 over CA¥AS River?
It is owned by the State Highway Agency.