Pr 3 117.9 KM over Jacaboa River
PoorPosted for loadPatillas Municipio, Puerto Rico · 5 KM Southwest of Maunabo · Structure no. 001361
- Built
- 1941
- 84 years old
- Condition
- Poor
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 233 ft
- 4 main spans
- Daily traffic
- 9,100
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 3 117.9 KM over Jacaboa River is a steel continuous stringer/multi-beam or girder carrying Pr 3 117.9 KM over Jacaboa River in Patillas Municipio, Puerto Rico. It was built in 1941, so it is 84 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 9,100 vehicles a day, roughly 4% of them trucks, projected to reach 12,600 by 2025. The structure is 233 ft (71.1 m) long and 28 ft wide. If it were closed, the detour would be 20.5 mi (33 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 3 117.9 KM over Jacaboa River built?
It was built in 1941, making it 84 years old in 2025.
What condition is Pr 3 117.9 KM over Jacaboa River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.
How much traffic does Pr 3 117.9 KM over Jacaboa River carry?
About 9,100 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 3 117.9 KM over Jacaboa River?
The structure is 233 ft (71.1 m) long with a longest span of 66 ft (20 m) and a deck 28 ft wide.
Who owns Pr 3 117.9 KM over Jacaboa River?
It is owned by the State Highway Agency.