Pr 927 over Blanco River
FairPosted for loadNaguabo Municipio, Puerto Rico · 1 Mile West of Naguabo · Structure no. 008051
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected May 2023
- Type
- Tee Beam
- Concrete
- Length
- 63 ft
- 2 main spans
- Daily traffic
- 900
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 927 over Blanco River is a concrete tee beam carrying Pr 927 over Blanco River in Naguabo Municipio, Puerto Rico. It was built in 1958, so it is 67 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 900 vehicles a day, roughly 3% of them trucks, projected to reach 1,300 by 2025. The structure is 63 ft (19.1 m) long and 20 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 927 over Blanco River built?
It was built in 1958, making it 67 years old in 2025.
What condition is Pr 927 over Blanco River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Pr 927 over Blanco River carry?
About 900 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Pr 927 over Blanco River?
The structure is 63 ft (19.1 m) long with a longest span of 31 ft (9.5 m) and a deck 20 ft wide.
Who owns Pr 927 over Blanco River?
It is owned by the State Highway Agency.