Off Pr 404 4.3 KM over Los Morones Creek
FairPosted for loadMoca Municipio, Puerto Rico · 3.14 Miles S.E. of Moca · Structure no. 028811
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 40 ft
- 1 main span
- Daily traffic
- 600
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 404 4.3 KM over Los Morones Creek is a steel stringer/multi-beam or girder carrying Off Pr 404 4.3 KM over Los Morones Creek in Moca Municipio, Puerto Rico. It was built in 2012, so it is 13 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 600 vehicles a day, roughly 1% of them trucks, projected to reach 800 by 2025. The structure is 40 ft (12.2 m) long and 12 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 404 4.3 KM over Los Morones Creek built?
It was built in 2012, making it 13 years old in 2025.
What condition is Off Pr 404 4.3 KM over Los Morones Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Off Pr 404 4.3 KM over Los Morones Creek carry?
About 600 vehicles per day (2017 count), of which roughly 1% are trucks.
How long is Off Pr 404 4.3 KM over Los Morones Creek?
The structure is 40 ft (12.2 m) long with a longest span of 38 ft (11.6 m) and a deck 12 ft wide.
Who owns Off Pr 404 4.3 KM over Los Morones Creek?
It is owned by the City or Municipal Highway Agency.