US Bridges

Off Pr 348 0.9 KM over Grande Creek

Fair

Mayaguez Municipio, Puerto Rico · 3 Km. East of Mayaguez · Structure no. 026081

Built
1984
41 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
31 ft
1 main span
Daily traffic
8,500
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Off Pr 348 0.9 KM over Grande Creek is a steel stringer/multi-beam or girder carrying Off Pr 348 0.9 KM over Grande Creek in Mayaguez Municipio, Puerto Rico. It was built in 1984, so it is 41 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, posting recommended but not legally implemented.

It carries about 8,500 vehicles a day, roughly 4% of them trucks, projected to reach 12,200 by 2025. The structure is 31 ft (9.3 m) long and 31 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesOff Pr 348 0.9 KM
CrossesGrande Creek
Location3 Km. East of Mayaguez
RouteCounty Highway 0
Coordinates18.18494, -67.12931
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 12 months
Operating statusOpen, posting recommended but not legally implemented
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating28.5 US tons
Inventory rating15.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length31 ft (9.3 m)
Longest span28 ft (8.6 m)
Deck width31 ft (9.5 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,500 (2017)
Projected traffic12,200 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$27,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Off Pr 348 0.9 KM over Grande Creek built?

It was built in 1984, making it 41 years old in 2025.

What condition is Off Pr 348 0.9 KM over Grande Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Off Pr 348 0.9 KM over Grande Creek carry?

About 8,500 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Off Pr 348 0.9 KM over Grande Creek?

The structure is 31 ft (9.3 m) long with a longest span of 28 ft (8.6 m) and a deck 31 ft wide.

Who owns Off Pr 348 0.9 KM over Grande Creek?

It is owned by the City or Municipal Highway Agency.