Pr 128 33.6 KM over Prieto River
FairPosted for loadMaricao Municipio, Puerto Rico · 12 KM East of Maricao · Structure no. 002611
- Built
- 1924
- 101 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 107 ft
- 3 main spans
- Daily traffic
- 300
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 128 33.6 KM over Prieto River is a steel stringer/multi-beam or girder carrying Pr 128 33.6 KM over Prieto River in Maricao Municipio, Puerto Rico. It was built in 1924, so it is 101 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 300 vehicles a day, roughly 3% of them trucks, projected to reach 400 by 2025. The structure is 107 ft (32.6 m) long and 21 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 128 33.6 KM over Prieto River built?
It was built in 1924, making it 101 years old in 2025.
What condition is Pr 128 33.6 KM over Prieto River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pr 128 33.6 KM over Prieto River carry?
About 300 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Pr 128 33.6 KM over Prieto River?
The structure is 107 ft (32.6 m) long with a longest span of 30 ft (9 m) and a deck 21 ft wide.
Who owns Pr 128 33.6 KM over Prieto River?
It is owned by the State Highway Agency.