Pr 105 15.9 KM over Maricao River
FairPosted for loadMaricao Municipio, Puerto Rico · 8 KM West of Maricao · Structure no. 002101
- Built
- 1921
- 104 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 101 ft
- 3 main spans
- Daily traffic
- 1,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 105 15.9 KM over Maricao River is a steel stringer/multi-beam or girder carrying Pr 105 15.9 KM over Maricao River in Maricao Municipio, Puerto Rico. It was built in 1921, so it is 104 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,000 vehicles a day, roughly 4% of them trucks, projected to reach 1,300 by 2025. The structure is 101 ft (30.9 m) long and 20 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 105 15.9 KM over Maricao River built?
It was built in 1921, making it 104 years old in 2025.
What condition is Pr 105 15.9 KM over Maricao River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Pr 105 15.9 KM over Maricao River carry?
About 1,000 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 105 15.9 KM over Maricao River?
The structure is 101 ft (30.9 m) long with a longest span of 34 ft (10.5 m) and a deck 20 ft wide.
Who owns Pr 105 15.9 KM over Maricao River?
It is owned by the State Highway Agency.