PR-204 0.7 KM over Ceiba Norte Creek
GoodPosted for loadLas Piedras Municipio, Puerto Rico · 2.59 Km. Sw. Las Piedras · Structure no. 028291
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 242 ft
- 3 main spans
- Daily traffic
- 10,800
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
PR-204 0.7 KM over Ceiba Norte Creek is a prestressed concrete stringer/multi-beam or girder carrying PR-204 0.7 KM over Ceiba Norte Creek in Las Piedras Municipio, Puerto Rico. It was built in 2011, so it is 14 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 10,800 vehicles a day, roughly 5% of them trucks, projected to reach 14,700 by 2025. The structure is 242 ft (73.7 m) long and 84 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was PR-204 0.7 KM over Ceiba Norte Creek built?
It was built in 2011, making it 14 years old in 2025.
What condition is PR-204 0.7 KM over Ceiba Norte Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does PR-204 0.7 KM over Ceiba Norte Creek carry?
About 10,800 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is PR-204 0.7 KM over Ceiba Norte Creek?
The structure is 242 ft (73.7 m) long with a longest span of 81 ft (24.8 m) and a deck 84 ft wide.
Who owns PR-204 0.7 KM over Ceiba Norte Creek?
It is owned by the State Highway Agency.