Pr 936 over Arenas Creek
FairLas Piedras Municipio, Puerto Rico · 4 KM N E of Las Piedras · Structure no. 005721
- Built
- 1933
- 92 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 35 ft
- 1 main span
- Daily traffic
- 4,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 936 over Arenas Creek is a steel stringer/multi-beam or girder carrying Pr 936 over Arenas Creek in Las Piedras Municipio, Puerto Rico. It was built in 1933, so it is 92 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,200 vehicles a day, roughly 5% of them trucks, projected to reach 5,700 by 2025. The structure is 35 ft (10.8 m) long and 21 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 936 over Arenas Creek built?
It was built in 1933, making it 92 years old in 2025.
What condition is Pr 936 over Arenas Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Pr 936 over Arenas Creek carry?
About 4,200 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 936 over Arenas Creek?
The structure is 35 ft (10.8 m) long with a longest span of 29 ft (8.9 m) and a deck 21 ft wide.
Who owns Pr 936 over Arenas Creek?
It is owned by the State Highway Agency.