Off Pr 135 KM 0.05 over Guayo River
FairLares Municipio, Puerto Rico · Pr 135 at KM 63.8 · Structure no. 028951
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected March 2025
- Type
- Slab
- Concrete
- Length
- 39 ft
- 2 main spans
- Daily traffic
- 3,500
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 135 KM 0.05 over Guayo River is a concrete slab carrying Off Pr 135 KM 0.05 over Guayo River in Lares Municipio, Puerto Rico. It was built in 1995, so it is 30 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,500 vehicles a day, roughly 4% of them trucks, projected to reach 4,500 by 2025. The structure is 39 ft (12 m) long and 19 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 135 KM 0.05 over Guayo River built?
It was built in 1995, making it 30 years old in 2025.
What condition is Off Pr 135 KM 0.05 over Guayo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2025.
How much traffic does Off Pr 135 KM 0.05 over Guayo River carry?
About 3,500 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Off Pr 135 KM 0.05 over Guayo River?
The structure is 39 ft (12 m) long with a longest span of 19 ft (5.7 m) and a deck 19 ft wide.
Who owns Off Pr 135 KM 0.05 over Guayo River?
It is owned by the City or Municipal Highway Agency.