Pr 30 Westbound over Valenciano River L Road
FairJuncos Municipio, Puerto Rico · 0.3 KM NW Int PR30 & · Structure no. 011022
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 363 ft
- 5 main spans
- Daily traffic
- 32,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 30 Westbound over Valenciano River L Road is a steel continuous stringer/multi-beam or girder carrying Pr 30 Westbound over Valenciano River L Road in Juncos Municipio, Puerto Rico. It was built in 1971, so it is 54 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 32,200 vehicles a day, roughly 5% of them trucks, projected to reach 48,400 by 2025. The structure is 363 ft (110.6 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 30 Westbound over Valenciano River L Road built?
It was built in 1971, making it 54 years old in 2025.
What condition is Pr 30 Westbound over Valenciano River L Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Pr 30 Westbound over Valenciano River L Road carry?
About 32,200 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 30 Westbound over Valenciano River L Road?
The structure is 363 ft (110.6 m) long with a longest span of 76 ft (23.3 m) and a deck 41 ft wide.
Who owns Pr 30 Westbound over Valenciano River L Road?
It is owned by the State Highway Agency.