Pr 53 Northbound over Dirt Road
FairHumacao Municipio, Puerto Rico · 3 KM S E of Humacao · Structure no. 023862
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 98 ft
- 1 main span
- Daily traffic
- 20,400
- 2017 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pr 53 Northbound over Dirt Road is a prestressed concrete stringer/multi-beam or girder carrying Pr 53 Northbound over Dirt Road in Humacao Municipio, Puerto Rico. It was built in 1995, so it is 30 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20,400 vehicles a day, roughly 5% of them trucks, projected to reach 27,900 by 2025. The structure is 98 ft (29.8 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 53 Northbound over Dirt Road built?
It was built in 1995, making it 30 years old in 2025.
What condition is Pr 53 Northbound over Dirt Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Pr 53 Northbound over Dirt Road carry?
About 20,400 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 53 Northbound over Dirt Road?
The structure is 98 ft (29.8 m) long with a longest span of 91 ft (27.7 m) and a deck 44 ft wide.
Who owns Pr 53 Northbound over Dirt Road?
It is owned by the State Toll Authority.