US Bridges

Off Pr 330 2.0 KM over Duey River

FairPosted for load

Hormigueros Municipio, Puerto Rico · 6 Kms.East of Hormigueros · Structure no. 026321

Built
1999
26 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
3,600
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Off Pr 330 2.0 KM over Duey River is a steel stringer/multi-beam or girder carrying Off Pr 330 2.0 KM over Duey River in Hormigueros Municipio, Puerto Rico. It was built in 1999, so it is 26 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 3,600 vehicles a day, roughly 5% of them trucks, projected to reach 5,200 by 2025. The structure is 40 ft (12.3 m) long and 19 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesOff Pr 330 2.0 KM
CrossesDuey River
Location6 Kms.East of Hormigueros
RouteCounty Highway 0
Coordinates18.13062, -67.07042
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating49.2 US tons
Inventory rating26.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length40 ft (12.3 m)
Longest span38 ft (11.7 m)
Deck width19 ft (5.9 m)
Roadway width14 ft (4.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,600 (2017)
Projected traffic5,200 by 2025
Trucks5%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Off Pr 330 2.0 KM over Duey River built?

It was built in 1999, making it 26 years old in 2025.

What condition is Off Pr 330 2.0 KM over Duey River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Off Pr 330 2.0 KM over Duey River carry?

About 3,600 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Off Pr 330 2.0 KM over Duey River?

The structure is 40 ft (12.3 m) long with a longest span of 38 ft (11.7 m) and a deck 19 ft wide.

Who owns Off Pr 330 2.0 KM over Duey River?

It is owned by the City or Municipal Highway Agency.