US Bridges

Pr 941 over Gurabo River

Fair

Gurabo Municipio, Puerto Rico · 3 KM from Gurabo City · Structure no. 025221

Built
1999
26 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
325 ft
3 main spans
Daily traffic
3,800
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 941 over Gurabo River is a prestressed concrete stringer/multi-beam or girder carrying Pr 941 over Gurabo River in Gurabo Municipio, Puerto Rico. It was built in 1999, so it is 26 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,800 vehicles a day, roughly 6% of them trucks, projected to reach 5,500 by 2025. The structure is 325 ft (99.2 m) long and 43 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesPr 941
CrossesGurabo River
Location3 KM from Gurabo City
RouteState Highway 941
Coordinates18.26413, -65.98413
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating89.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length325 ft (99.2 m)
Longest span109 ft (33.2 m)
Deck width43 ft (13 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,800 (2017)
Projected traffic5,500 by 2025
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 941 over Gurabo River built?

It was built in 1999, making it 26 years old in 2025.

What condition is Pr 941 over Gurabo River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Pr 941 over Gurabo River carry?

About 3,800 vehicles per day (2017 count), of which roughly 6% are trucks.

How long is Pr 941 over Gurabo River?

The structure is 325 ft (99.2 m) long with a longest span of 109 ft (33.2 m) and a deck 43 ft wide.

Who owns Pr 941 over Gurabo River?

It is owned by the State Highway Agency.