Pr 181 Nbd 42.8 KM over Pr 30 7.4 KM
FairPosted for loadGurabo Municipio, Puerto Rico · 0.5 KM South of Gurabo · Structure no. 010302
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected July 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 173 ft
- 4 main spans
- Daily traffic
- 2,800
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 181 Nbd 42.8 KM over Pr 30 7.4 KM is a concrete continuous tee beam carrying Pr 181 Nbd 42.8 KM over Pr 30 7.4 KM in Gurabo Municipio, Puerto Rico. It was built in 1969, so it is 56 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,800 vehicles a day, roughly 4% of them trucks, projected to reach 3,800 by 2025. The structure is 173 ft (52.6 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 181 Nbd 42.8 KM over Pr 30 7.4 KM built?
It was built in 1969, making it 56 years old in 2025.
What condition is Pr 181 Nbd 42.8 KM over Pr 30 7.4 KM in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Pr 181 Nbd 42.8 KM over Pr 30 7.4 KM carry?
About 2,800 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 181 Nbd 42.8 KM over Pr 30 7.4 KM?
The structure is 173 ft (52.6 m) long with a longest span of 50 ft (15.1 m) and a deck 41 ft wide.
Who owns Pr 181 Nbd 42.8 KM over Pr 30 7.4 KM?
It is owned by the State Highway Agency.