US Bridges

Off Pr 836 over Guaynabo Rv Camarones Ck

Fair

Guaynabo Municipio, Puerto Rico · 4 Km. South of Guaynabo · Structure no. 026091

Built
1999
26 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
85 ft
1 main span
Daily traffic
800
2005 count
Owner
City
City or Municipal Highway Agency

About this bridge

Off Pr 836 over Guaynabo Rv Camarones Ck is a prestressed concrete stringer/multi-beam or girder carrying Off Pr 836 over Guaynabo Rv Camarones Ck in Guaynabo Municipio, Puerto Rico. It was built in 1999, so it is 26 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 800 vehicles a day, roughly 4% of them trucks, projected to reach 1,000 by 2025. The structure is 85 ft (26 m) long and 29 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesOff Pr 836
CrossesGuaynabo Rv Camarones Ck
Location4 Km. South of Guaynabo
RouteCounty Highway 0
Coordinates18.33431, -66.109
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating72.8 US tons
Inventory rating43.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length85 ft (26 m)
Longest span80 ft (24.5 m)
Deck width29 ft (8.9 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic800 (2005)
Projected traffic1,000 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$195,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Off Pr 836 over Guaynabo Rv Camarones Ck built?

It was built in 1999, making it 26 years old in 2025.

What condition is Off Pr 836 over Guaynabo Rv Camarones Ck in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Off Pr 836 over Guaynabo Rv Camarones Ck carry?

About 800 vehicles per day (2005 count), of which roughly 4% are trucks.

How long is Off Pr 836 over Guaynabo Rv Camarones Ck?

The structure is 85 ft (26 m) long with a longest span of 80 ft (24.5 m) and a deck 29 ft wide.

Who owns Off Pr 836 over Guaynabo Rv Camarones Ck?

It is owned by the City or Municipal Highway Agency.