Pr 1 over Guaynabo River & Pr
FairPosted for loadGuaynabo Municipio, Puerto Rico · 5 KM South of Guaynabo · Structure no. 006921
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected October 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 261 ft
- 5 main spans
- Daily traffic
- 40,100
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 1 over Guaynabo River & Pr is a concrete continuous tee beam carrying Pr 1 over Guaynabo River & Pr in Guaynabo Municipio, Puerto Rico. It was built in 1955, so it is 70 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 40,100 vehicles a day, roughly 5% of them trucks, projected to reach 46,900 by 2025. The structure is 261 ft (79.5 m) long and 67 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 1 over Guaynabo River & Pr built?
It was built in 1955, making it 70 years old in 2025.
What condition is Pr 1 over Guaynabo River & Pr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Pr 1 over Guaynabo River & Pr carry?
About 40,100 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 1 over Guaynabo River & Pr?
The structure is 261 ft (79.5 m) long with a longest span of 72 ft (22 m) and a deck 67 ft wide.
Who owns Pr 1 over Guaynabo River & Pr?
It is owned by the State Highway Agency.