Pr 2 Wbd KM 209.1 over Waterway
FairPosted for loadGuayanilla Municipio, Puerto Rico · 3.5 KM S E of Guayanilla · Structure no. 009452
- Built
- 1968
- 57 years old, rebuilt 1987
- Condition
- Fair
- inspected April 2024
- Type
- Slab
- Concrete Continuous
- Length
- 78 ft
- 3 main spans
- Daily traffic
- 16,650
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 2 Wbd KM 209.1 over Waterway is a concrete continuous slab carrying Pr 2 Wbd KM 209.1 over Waterway in Guayanilla Municipio, Puerto Rico. It was built in 1968 and reconstructed in 1987, so it is 57 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 16,650 vehicles a day, roughly 5% of them trucks, projected to reach 24,150 by 2025. The structure is 78 ft (23.9 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 2 Wbd KM 209.1 over Waterway built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1987.
What condition is Pr 2 Wbd KM 209.1 over Waterway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pr 2 Wbd KM 209.1 over Waterway carry?
About 16,650 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 2 Wbd KM 209.1 over Waterway?
The structure is 78 ft (23.9 m) long with a longest span of 29 ft (8.7 m) and a deck 41 ft wide.
Who owns Pr 2 Wbd KM 209.1 over Waterway?
It is owned by the State Highway Agency.