Pr 127 over Guayanilla River
FairPosted for loadGuayanilla Municipio, Puerto Rico · At Entrance to Guayanilla · Structure no. 000811
- Built
- 1922
- 103 years old, rebuilt 1966
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 130 ft
- 3 main spans
- Daily traffic
- 7,500
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 127 over Guayanilla River is a steel stringer/multi-beam or girder carrying Pr 127 over Guayanilla River in Guayanilla Municipio, Puerto Rico. It was built in 1922 and reconstructed in 1966, so it is 103 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 7,500 vehicles a day, roughly 4% of them trucks, projected to reach 9,800 by 2025. The structure is 130 ft (39.5 m) long and 39 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 127 over Guayanilla River built?
It was built in 1922, making it 103 years old in 2025. It was reconstructed in 1966.
What condition is Pr 127 over Guayanilla River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Pr 127 over Guayanilla River carry?
About 7,500 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 127 over Guayanilla River?
The structure is 130 ft (39.5 m) long with a longest span of 64 ft (19.5 m) and a deck 39 ft wide.
Who owns Pr 127 over Guayanilla River?
It is owned by the State Highway Agency.