US Bridges

Calle 1 0.1 KM over Stream

FairPosted for load

Guayama Municipio, Puerto Rico · 0.5 KM W PR149 KM 63.9 · Structure no. 030341

Built
1901
124 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
27 ft
1 main span
Daily traffic
500
2017 count
Owner
State
State Highway Agency

About this bridge

Calle 1 0.1 KM over Stream is a steel stringer/multi-beam or girder carrying Calle 1 0.1 KM over Stream in Guayama Municipio, Puerto Rico. It was built in 1901, so it is 124 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 500 vehicles a day, projected to reach 750 by 2025. The structure is 27 ft (8.3 m) long and 15 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCalle 1 0.1 KM
CrossesStream
Location0.5 KM W PR149 KM 63.9
RouteCity Street 0
Coordinates18.07697, -66.5031
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating23.9 US tons
Inventory rating14.3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length27 ft (8.3 m)
Longest span25 ft (7.7 m)
Deck width15 ft (4.6 m)
Roadway width13 ft (4.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2017)
Projected traffic750 by 2025
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Calle 1 0.1 KM over Stream built?

It was built in 1901, making it 124 years old in 2025.

What condition is Calle 1 0.1 KM over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Calle 1 0.1 KM over Stream carry?

About 500 vehicles per day (2017 count).

How long is Calle 1 0.1 KM over Stream?

The structure is 27 ft (8.3 m) long with a longest span of 25 ft (7.7 m) and a deck 15 ft wide.

Who owns Calle 1 0.1 KM over Stream?

It is owned by the State Highway Agency.