US Bridges

Pr 53 Eastbound over Pr 7710

Fair

Guayama Municipio, Puerto Rico · 4 KM Northwest of Guayama · Structure no. 022532

Built
1994
31 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
170 ft
2 main spans
Daily traffic
7,900
2017 count
Owner
Toll Authority
State Toll Authority

About this bridge

Pr 53 Eastbound over Pr 7710 is a prestressed concrete stringer/multi-beam or girder carrying Pr 53 Eastbound over Pr 7710 in Guayama Municipio, Puerto Rico. It was built in 1994, so it is 31 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,900 vehicles a day, roughly 5% of them trucks, projected to reach 11,450 by 2025. The structure is 170 ft (51.7 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesPr 53 Eastbound
CrossesPr 7710
Location4 KM Northwest of Guayama
RouteInterstate 53
Coordinates17.98635, -66.15389
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating65.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length170 ft (51.7 m)
Longest span81 ft (24.6 m)
Deck width44 ft (13.4 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,900 (2017)
Projected traffic11,450 by 2025
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 53 Eastbound over Pr 7710 built?

It was built in 1994, making it 31 years old in 2025.

What condition is Pr 53 Eastbound over Pr 7710 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Pr 53 Eastbound over Pr 7710 carry?

About 7,900 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 53 Eastbound over Pr 7710?

The structure is 170 ft (51.7 m) long with a longest span of 81 ft (24.6 m) and a deck 44 ft wide.

Who owns Pr 53 Eastbound over Pr 7710?

It is owned by the State Toll Authority.