US Bridges

Off Pr 332 1.15 KM over Loco River

Good

Guanica Municipio, Puerto Rico · 3 KM North of Guanica · Structure no. 027631

Built
2004
21 years old
Condition
Good
inspected May 2024
Type
Truss - Thru
Steel
Length
83 ft
1 main span
Daily traffic
1,000
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Off Pr 332 1.15 KM over Loco River is a steel truss - thru carrying Off Pr 332 1.15 KM over Loco River in Guanica Municipio, Puerto Rico. It was built in 2004, so it is 21 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 1,300 by 2025. The structure is 83 ft (25.3 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesOff Pr 332 1.15 KM
CrossesLoco River
Location3 KM North of Guanica
RouteCounty Highway 0
Coordinates17.98709, -66.91292
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating59 US tons
Inventory rating36 US tons

Structure

Structure typeTruss - Thru
MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length83 ft (25.3 m)
Longest span83 ft (25.3 m)
Deck width32 ft (9.9 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2017)
Projected traffic1,300 by 2025
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Off Pr 332 1.15 KM over Loco River built?

It was built in 2004, making it 21 years old in 2025.

What condition is Off Pr 332 1.15 KM over Loco River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Off Pr 332 1.15 KM over Loco River carry?

About 1,000 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is Off Pr 332 1.15 KM over Loco River?

The structure is 83 ft (25.3 m) long with a longest span of 83 ft (25.3 m) and a deck 32 ft wide.

Who owns Off Pr 332 1.15 KM over Loco River?

It is owned by the City or Municipal Highway Agency.