Pr 2 over Dirt Road
FairGuanica Municipio, Puerto Rico · 5 KM South West of Yauco · Structure no. 016701
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 85 ft
- 1 main span
- Daily traffic
- 29,800
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 2 over Dirt Road is a prestressed concrete stringer/multi-beam or girder carrying Pr 2 over Dirt Road in Guanica Municipio, Puerto Rico. It was built in 1979, so it is 46 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 29,800 vehicles a day, roughly 5% of them trucks, projected to reach 40,500 by 2025. The structure is 85 ft (26 m) long and 93 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 2 over Dirt Road built?
It was built in 1979, making it 46 years old in 2025.
What condition is Pr 2 over Dirt Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Pr 2 over Dirt Road carry?
About 29,800 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 2 over Dirt Road?
The structure is 85 ft (26 m) long with a longest span of 82 ft (25 m) and a deck 93 ft wide.
Who owns Pr 2 over Dirt Road?
It is owned by the State Highway Agency.