Pr 2 187.4 KM over Future Road & Channe
FairGuanica Municipio, Puerto Rico · 5 Kms SE of Sabana Grande · Structure no. 016611
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 120 ft
- 1 main span
- Daily traffic
- 24,400
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 2 187.4 KM over Future Road & Channe is a prestressed concrete stringer/multi-beam or girder carrying Pr 2 187.4 KM over Future Road & Channe in Guanica Municipio, Puerto Rico. It was built in 1979, so it is 46 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 24,400 vehicles a day, roughly 5% of them trucks, projected to reach 33,200 by 2025. The structure is 120 ft (36.6 m) long and 94 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 2 187.4 KM over Future Road & Channe built?
It was built in 1979, making it 46 years old in 2025.
What condition is Pr 2 187.4 KM over Future Road & Channe in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Pr 2 187.4 KM over Future Road & Channe carry?
About 24,400 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 2 187.4 KM over Future Road & Channe?
The structure is 120 ft (36.6 m) long with a longest span of 116 ft (35.4 m) and a deck 94 ft wide.
Who owns Pr 2 187.4 KM over Future Road & Channe?
It is owned by the State Highway Agency.