US Bridges

Pr 704 2.2 KM over Los Canalitos Creek

Fair

Coamo Municipio, Puerto Rico · 4 KM South East of Coamo · Structure no. 019481

Built
1989
36 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
237 ft
3 main spans
Daily traffic
1,000
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 704 2.2 KM over Los Canalitos Creek is a prestressed concrete stringer/multi-beam or girder carrying Pr 704 2.2 KM over Los Canalitos Creek in Coamo Municipio, Puerto Rico. It was built in 1989, so it is 36 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, roughly 4% of them trucks, projected to reach 1,500 by 2025. The structure is 237 ft (72.2 m) long and 42 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesPr 704 2.2 KM
CrossesLos Canalitos Creek
Location4 KM South East of Coamo
RouteState Highway 704
Coordinates18.0797, -66.30449
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating96 US tons
Inventory rating55.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length237 ft (72.2 m)
Longest span74 ft (22.7 m)
Deck width42 ft (12.8 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2017)
Projected traffic1,500 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$129,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 704 2.2 KM over Los Canalitos Creek built?

It was built in 1989, making it 36 years old in 2025.

What condition is Pr 704 2.2 KM over Los Canalitos Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Pr 704 2.2 KM over Los Canalitos Creek carry?

About 1,000 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Pr 704 2.2 KM over Los Canalitos Creek?

The structure is 237 ft (72.2 m) long with a longest span of 74 ft (22.7 m) and a deck 42 ft wide.

Who owns Pr 704 2.2 KM over Los Canalitos Creek?

It is owned by the State Highway Agency.