Pr 173 17.1 KM over Bayamon River
FairPosted for loadCidra Municipio, Puerto Rico · 4.5 KM North of Cidra · Structure no. 003901
- Built
- 1949
- 76 years old
- Condition
- Fair
- inspected April 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 79 ft
- 2 main spans
- Daily traffic
- 9,600
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 173 17.1 KM over Bayamon River is a concrete continuous tee beam carrying Pr 173 17.1 KM over Bayamon River in Cidra Municipio, Puerto Rico. It was built in 1949, so it is 76 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 9,600 vehicles a day, roughly 4% of them trucks, projected to reach 11,500 by 2025. The structure is 79 ft (24.1 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 173 17.1 KM over Bayamon River built?
It was built in 1949, making it 76 years old in 2025.
What condition is Pr 173 17.1 KM over Bayamon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pr 173 17.1 KM over Bayamon River carry?
About 9,600 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 173 17.1 KM over Bayamon River?
The structure is 79 ft (24.1 m) long with a longest span of 40 ft (12.1 m) and a deck 32 ft wide.
Who owns Pr 173 17.1 KM over Bayamon River?
It is owned by the State Highway Agency.