Pr 173 11.6 KM over Arroyata River
FairCidra Municipio, Puerto Rico · 2 KM West of Cidra · Structure no. 003891
- Built
- 1930
- 95 years old, rebuilt 1982
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 7,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 173 11.6 KM over Arroyata River is a steel stringer/multi-beam or girder carrying Pr 173 11.6 KM over Arroyata River in Cidra Municipio, Puerto Rico. It was built in 1930 and reconstructed in 1982, so it is 95 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,000 vehicles a day, roughly 5% of them trucks, projected to reach 10,100 by 2025. The structure is 30 ft (9.1 m) long and 40 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 173 11.6 KM over Arroyata River built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1982.
What condition is Pr 173 11.6 KM over Arroyata River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pr 173 11.6 KM over Arroyata River carry?
About 7,000 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 173 11.6 KM over Arroyata River?
The structure is 30 ft (9.1 m) long with a longest span of 27 ft (8.1 m) and a deck 40 ft wide.
Who owns Pr 173 11.6 KM over Arroyata River?
It is owned by the State Highway Agency.