Pr 149 12.4 KM over Grande De Manati River
FairCiales Municipio, Puerto Rico · 1 KM North East of Ciales · Structure no. 013741
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 459 ft
- 4 main spans
- Daily traffic
- 15,800
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 149 12.4 KM over Grande De Manati River is a prestressed concrete stringer/multi-beam or girder carrying Pr 149 12.4 KM over Grande De Manati River in Ciales Municipio, Puerto Rico. It was built in 1975, so it is 50 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,800 vehicles a day, roughly 5% of them trucks, projected to reach 19,900 by 2025. The structure is 459 ft (139.8 m) long and 51 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 149 12.4 KM over Grande De Manati River built?
It was built in 1975, making it 50 years old in 2025.
What condition is Pr 149 12.4 KM over Grande De Manati River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Pr 149 12.4 KM over Grande De Manati River carry?
About 15,800 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 149 12.4 KM over Grande De Manati River?
The structure is 459 ft (139.8 m) long with a longest span of 133 ft (40.4 m) and a deck 51 ft wide.
Who owns Pr 149 12.4 KM over Grande De Manati River?
It is owned by the State Highway Agency.