US Bridges

Pr 149 over DOÑA Juana Creek

FairPosted for load

Ciales Municipio, Puerto Rico · 8 KM North of Villalba · Structure no. 003151

Built
1923
102 years old
Condition
Fair
inspected December 2024
Type
Slab
Concrete Continuous
Length
48 ft
2 main spans
Daily traffic
700
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 149 over DOÑA Juana Creek is a concrete continuous slab carrying Pr 149 over DOÑA Juana Creek in Ciales Municipio, Puerto Rico. It was built in 1923, so it is 102 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 700 vehicles a day, roughly 5% of them trucks, projected to reach 900 by 2025. The structure is 48 ft (14.6 m) long and 20 ft wide. If it were closed, the detour would be 10.6 mi (17 km).

CarriesPr 149
CrossesDOÑA Juana Creek
Location8 KM North of Villalba
RouteState Highway 149
Coordinates18.18293, -66.51208
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating21.9 US tons
Inventory rating13.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length48 ft (14.6 m)
Longest span24 ft (7.4 m)
Deck width20 ft (6.2 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic700 (2017)
Projected traffic900 by 2025
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed10.6 mi (17 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$213,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 149 over DOÑA Juana Creek built?

It was built in 1923, making it 102 years old in 2025.

What condition is Pr 149 over DOÑA Juana Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Pr 149 over DOÑA Juana Creek carry?

About 700 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 149 over DOÑA Juana Creek?

The structure is 48 ft (14.6 m) long with a longest span of 24 ft (7.4 m) and a deck 20 ft wide.

Who owns Pr 149 over DOÑA Juana Creek?

It is owned by the State Highway Agency.