US Bridges

Pr 975 over Creek

Fair

Ceiba Municipio, Puerto Rico · 9 KM West of Ceiba · Structure no. 017031

Built
1980
45 years old
Condition
Fair
inspected November 2023
Type
Slab
Concrete
Length
31 ft
1 main span
Daily traffic
1,200
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 975 over Creek is a concrete slab carrying Pr 975 over Creek in Ceiba Municipio, Puerto Rico. It was built in 1980, so it is 45 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,200 vehicles a day, roughly 2% of them trucks, projected to reach 1,500 by 2025. The structure is 31 ft (9.6 m) long and 30 ft wide. If it were closed, the detour would be 7.5 mi (12 km).

CarriesPr 975
CrossesCreek
Location9 KM West of Ceiba
RouteState Highway 975
Coordinates18.26092, -65.72355
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating94 US tons
Inventory rating56.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length31 ft (9.6 m)
Longest span28 ft (8.5 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,200 (2017)
Projected traffic1,500 by 2025
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed7.5 mi (12 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$204,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 975 over Creek built?

It was built in 1980, making it 45 years old in 2025.

What condition is Pr 975 over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Pr 975 over Creek carry?

About 1,200 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Pr 975 over Creek?

The structure is 31 ft (9.6 m) long with a longest span of 28 ft (8.5 m) and a deck 30 ft wide.

Who owns Pr 975 over Creek?

It is owned by the State Highway Agency.