Pr 52 Northbound over Access Road to Pr 1
FairPosted for loadCayey Municipio, Puerto Rico · 1.6 KM East of Cayey · Structure no. 020282
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 168 ft
- 2 main spans
- Daily traffic
- 65,700
- 2017 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pr 52 Northbound over Access Road to Pr 1 is a concrete continuous box beam or girders - multiple carrying Pr 52 Northbound over Access Road to Pr 1 in Cayey Municipio, Puerto Rico. It was built in 1973, so it is 52 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 65,700 vehicles a day, roughly 2% of them trucks, projected to reach 82,800 by 2025. The structure is 168 ft (51.1 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 52 Northbound over Access Road to Pr 1 built?
It was built in 1973, making it 52 years old in 2025.
What condition is Pr 52 Northbound over Access Road to Pr 1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Pr 52 Northbound over Access Road to Pr 1 carry?
About 65,700 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Pr 52 Northbound over Access Road to Pr 1?
The structure is 168 ft (51.1 m) long with a longest span of 81 ft (24.6 m) and a deck 59 ft wide.
Who owns Pr 52 Northbound over Access Road to Pr 1?
It is owned by the State Toll Authority.