Pr 52 Soub 31.5 KM over Pr 7786 0.4 KM
FairCayey Municipio, Puerto Rico · 5 KM North East of Cayey · Structure no. 012812
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 99 ft
- 1 main span
- Daily traffic
- 91,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 52 Soub 31.5 KM over Pr 7786 0.4 KM is a prestressed concrete stringer/multi-beam or girder carrying Pr 52 Soub 31.5 KM over Pr 7786 0.4 KM in Cayey Municipio, Puerto Rico. It was built in 1972, so it is 53 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 91,700 vehicles a day, roughly 5% of them trucks, projected to reach 115,500 by 2025. The structure is 99 ft (30.2 m) long and 47 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 52 Soub 31.5 KM over Pr 7786 0.4 KM built?
It was built in 1972, making it 53 years old in 2025.
What condition is Pr 52 Soub 31.5 KM over Pr 7786 0.4 KM in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Pr 52 Soub 31.5 KM over Pr 7786 0.4 KM carry?
About 91,700 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 52 Soub 31.5 KM over Pr 7786 0.4 KM?
The structure is 99 ft (30.2 m) long with a longest span of 94 ft (28.8 m) and a deck 47 ft wide.
Who owns Pr 52 Soub 31.5 KM over Pr 7786 0.4 KM?
It is owned by the State Highway Agency.