US Bridges

Pr 738 0.2 KM over Prieta Creek

FairPosted for load

Cayey Municipio, Puerto Rico · 4 KM North East of Cayey · Structure no. 005221

Built
1937
88 years old, rebuilt 1961
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
50 ft
1 main span
Daily traffic
7,900
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 738 0.2 KM over Prieta Creek is a steel stringer/multi-beam or girder carrying Pr 738 0.2 KM over Prieta Creek in Cayey Municipio, Puerto Rico. It was built in 1937 and reconstructed in 1961, so it is 88 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 7,900 vehicles a day, roughly 5% of them trucks, projected to reach 11,400 by 2025. The structure is 50 ft (15.2 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPr 738 0.2 KM
CrossesPrieta Creek
Location4 KM North East of Cayey
RouteState Highway 738
Coordinates18.12715, -66.13543
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating39.4 US tons
Inventory rating23.5 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length50 ft (15.2 m)
Longest span46 ft (14 m)
Deck width25 ft (7.5 m)
Roadway width22 ft (6.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,900 (2017)
Projected traffic11,400 by 2025
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$34,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 738 0.2 KM over Prieta Creek built?

It was built in 1937, making it 88 years old in 2025. It was reconstructed in 1961.

What condition is Pr 738 0.2 KM over Prieta Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Pr 738 0.2 KM over Prieta Creek carry?

About 7,900 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 738 0.2 KM over Prieta Creek?

The structure is 50 ft (15.2 m) long with a longest span of 46 ft (14 m) and a deck 25 ft wide.

Who owns Pr 738 0.2 KM over Prieta Creek?

It is owned by the State Highway Agency.