PR-66 (west Bound) over Dirt RD & Calderon C
GoodCanovanas Municipio, Puerto Rico · 1.17 K. S.E. PR-3 & · Structure no. 029692
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 987 ft
- 8 main spans
- Daily traffic
- 13,850
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
PR-66 (west Bound) over Dirt RD & Calderon C is a prestressed concrete stringer/multi-beam or girder carrying PR-66 (west Bound) over Dirt RD & Calderon C in Canovanas Municipio, Puerto Rico. It was built in 2013, so it is 12 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,850 vehicles a day, roughly 5% of them trucks, projected to reach 18,950 by 2025. The structure is 987 ft (300.9 m) long and 44 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was PR-66 (west Bound) over Dirt RD & Calderon C built?
It was built in 2013, making it 12 years old in 2025.
What condition is PR-66 (west Bound) over Dirt RD & Calderon C in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does PR-66 (west Bound) over Dirt RD & Calderon C carry?
About 13,850 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is PR-66 (west Bound) over Dirt RD & Calderon C?
The structure is 987 ft (300.9 m) long with a longest span of 131 ft (40 m) and a deck 44 ft wide.
Who owns PR-66 (west Bound) over Dirt RD & Calderon C?
It is owned by the State Highway Agency.