Pr 951 KM 1.9 over Chiquito River
FairPosted for loadCanovanas Municipio, Puerto Rico · 2 KM North of Canovanas · Structure no. 023791
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 173 ft
- 3 main spans
- Daily traffic
- 4,100
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 951 KM 1.9 over Chiquito River is a prestressed concrete stringer/multi-beam or girder carrying Pr 951 KM 1.9 over Chiquito River in Canovanas Municipio, Puerto Rico. It was built in 1994, so it is 31 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 4,100 vehicles a day, roughly 5% of them trucks, projected to reach 5,900 by 2025. The structure is 173 ft (52.8 m) long and 42 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 951 KM 1.9 over Chiquito River built?
It was built in 1994, making it 31 years old in 2025.
What condition is Pr 951 KM 1.9 over Chiquito River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pr 951 KM 1.9 over Chiquito River carry?
About 4,100 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 951 KM 1.9 over Chiquito River?
The structure is 173 ft (52.8 m) long with a longest span of 82 ft (24.9 m) and a deck 42 ft wide.
Who owns Pr 951 KM 1.9 over Chiquito River?
It is owned by the State Highway Agency.