Off Pr 185 7.6 KM over Cubuy River
FairCanovanas Municipio, Puerto Rico · 7.5 KM South of Canovanas · Structure no. 013501
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected June 2024
- Type
- Slab
- Concrete Continuous
- Length
- 63 ft
- 2 main spans
- Daily traffic
- 10,700
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 185 7.6 KM over Cubuy River is a concrete continuous slab carrying Off Pr 185 7.6 KM over Cubuy River in Canovanas Municipio, Puerto Rico. It was built in 1975, so it is 50 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, posting recommended but not legally implemented.
It carries about 10,700 vehicles a day, roughly 2% of them trucks, projected to reach 12,500 by 2025. The structure is 63 ft (19.2 m) long and 21 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 185 7.6 KM over Cubuy River built?
It was built in 1975, making it 50 years old in 2025.
What condition is Off Pr 185 7.6 KM over Cubuy River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Off Pr 185 7.6 KM over Cubuy River carry?
About 10,700 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Off Pr 185 7.6 KM over Cubuy River?
The structure is 63 ft (19.2 m) long with a longest span of 30 ft (9 m) and a deck 21 ft wide.
Who owns Off Pr 185 7.6 KM over Cubuy River?
It is owned by the City or Municipal Highway Agency.