Pr 186 7.40 KM over Cubuy River
FairCanovanas Municipio, Puerto Rico · 15 KM South of Canovanas · Structure no. 004451
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected April 2024
- Type
- Slab
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 1,600
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 186 7.40 KM over Cubuy River is a concrete slab carrying Pr 186 7.40 KM over Cubuy River in Canovanas Municipio, Puerto Rico. It was built in 1957, so it is 68 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, posting recommended but not legally implemented.
It carries about 1,600 vehicles a day, roughly 5% of them trucks, projected to reach 2,300 by 2025. The structure is 26 ft (8 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 186 7.40 KM over Cubuy River built?
It was built in 1957, making it 68 years old in 2025.
What condition is Pr 186 7.40 KM over Cubuy River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pr 186 7.40 KM over Cubuy River carry?
About 1,600 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 186 7.40 KM over Cubuy River?
The structure is 26 ft (8 m) long with a longest span of 24 ft (7.3 m) and a deck 31 ft wide.
Who owns Pr 186 7.40 KM over Cubuy River?
It is owned by the State Highway Agency.