Pr 455 over Soller Creek
PoorCamuy Municipio, Puerto Rico · 12 KM South West of Camuy · Structure no. 013711
- Built
- 1957
- 68 years old, rebuilt 1983
- Condition
- Poor
- inspected March 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 40 ft
- 1 main span
- Daily traffic
- 1,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 455 over Soller Creek is a steel stringer/multi-beam or girder carrying Pr 455 over Soller Creek in Camuy Municipio, Puerto Rico. It was built in 1957 and reconstructed in 1983, so it is 68 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,700 vehicles a day, roughly 4% of them trucks, projected to reach 2,200 by 2025. The structure is 40 ft (12.2 m) long and 27 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 455 over Soller Creek built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1983.
What condition is Pr 455 over Soller Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2025.
How much traffic does Pr 455 over Soller Creek carry?
About 1,700 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 455 over Soller Creek?
The structure is 40 ft (12.2 m) long with a longest span of 40 ft (12.2 m) and a deck 27 ft wide.
Who owns Pr 455 over Soller Creek?
It is owned by the State Highway Agency.