Pr 52 Sbnd KM 13.8 over Pr 796 KM 0.6
FairCaguas Municipio, Puerto Rico · 2 KM North of Caguas · Structure no. 020652
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 165 ft
- 2 main spans
- Daily traffic
- 51,000
- 2017 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pr 52 Sbnd KM 13.8 over Pr 796 KM 0.6 is a prestressed concrete stringer/multi-beam or girder carrying Pr 52 Sbnd KM 13.8 over Pr 796 KM 0.6 in Caguas Municipio, Puerto Rico. It was built in 1976, so it is 49 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 51,000 vehicles a day, roughly 2% of them trucks, projected to reach 69,850 by 2025. The structure is 165 ft (50.2 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 52 Sbnd KM 13.8 over Pr 796 KM 0.6 built?
It was built in 1976, making it 49 years old in 2025.
What condition is Pr 52 Sbnd KM 13.8 over Pr 796 KM 0.6 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Pr 52 Sbnd KM 13.8 over Pr 796 KM 0.6 carry?
About 51,000 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Pr 52 Sbnd KM 13.8 over Pr 796 KM 0.6?
The structure is 165 ft (50.2 m) long with a longest span of 82 ft (25.1 m) and a deck 59 ft wide.
Who owns Pr 52 Sbnd KM 13.8 over Pr 796 KM 0.6?
It is owned by the State Toll Authority.