Off Pr 784 2.3 KM over CA¥ABONCITO River
FairCaguas Municipio, Puerto Rico · 2 KM S W from Caguas · Structure no. 019431
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 84 ft
- 1 main span
- Daily traffic
- 7,800
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 784 2.3 KM over CA¥ABONCITO River is a prestressed concrete stringer/multi-beam or girder carrying Off Pr 784 2.3 KM over CA¥ABONCITO River in Caguas Municipio, Puerto Rico. It was built in 1989, so it is 36 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,800 vehicles a day, roughly 2% of them trucks, projected to reach 11,200 by 2025. The structure is 84 ft (25.5 m) long and 43 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 784 2.3 KM over CA¥ABONCITO River built?
It was built in 1989, making it 36 years old in 2025.
What condition is Off Pr 784 2.3 KM over CA¥ABONCITO River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Off Pr 784 2.3 KM over CA¥ABONCITO River carry?
About 7,800 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Off Pr 784 2.3 KM over CA¥ABONCITO River?
The structure is 84 ft (25.5 m) long with a longest span of 79 ft (24.2 m) and a deck 43 ft wide.
Who owns Off Pr 784 2.3 KM over CA¥ABONCITO River?
It is owned by the City or Municipal Highway Agency.