Pr 30 Eabd 1.75 KM over Caguitas River
FairCaguas Municipio, Puerto Rico · 3 KM North East of Caguas · Structure no. 009901
- Built
- 1968
- 57 years old, rebuilt 2002
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 215 ft
- 3 main spans
- Daily traffic
- 78,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 30 Eabd 1.75 KM over Caguitas River is a prestressed concrete stringer/multi-beam or girder carrying Pr 30 Eabd 1.75 KM over Caguitas River in Caguas Municipio, Puerto Rico. It was built in 1968 and reconstructed in 2002, so it is 57 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 78,200 vehicles a day, roughly 5% of them trucks, projected to reach 118,100 by 2025. The structure is 215 ft (65.6 m) long and 110 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 30 Eabd 1.75 KM over Caguitas River built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2002.
What condition is Pr 30 Eabd 1.75 KM over Caguitas River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Pr 30 Eabd 1.75 KM over Caguitas River carry?
About 78,200 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 30 Eabd 1.75 KM over Caguitas River?
The structure is 215 ft (65.6 m) long with a longest span of 72 ft (21.9 m) and a deck 110 ft wide.
Who owns Pr 30 Eabd 1.75 KM over Caguitas River?
It is owned by the State Highway Agency.